Navigating Thames Water’s Latest Landowner Letters: A Guide for Local Residents

If you live or own property near the proposed Teddington Direct River Abstraction (TDRA) project route, you may have recently received formal correspondence from Thames Water.

As part of the land referencing process for their Development Consent Order (DCO) application, Thames Water’s project team is issuing two types of letters to landowners and occupiers within the proposed Order Limits. Below is a breakdown of what these letters mean and what action (if any) you need to take.

Subsoil Interest Notification

  • Purpose: Notifies owners and occupiers that the project may seek powers to acquire or use subsoil deep beneath their land for the proposed pipeline or tunnel route.
  • Action Required: No action required. Issued for early awareness only.
  • Impact & Details: Receiving this letter does not mean acquisition will happen, nor does it affect existing property ownership, legal rights, or current land use.

Confirmation of Land Interests (Schedule & Plan)

  • Purpose: Validates land ownership and occupation details collected through prior Land Interest Questionnaires and engagement activities.
  • Action Required: Action required.
  • Impact & Details: Recipients should carefully review the attached schedule and boundary plan, then notify Thames Water whether the details are accurate or require updates.
  • Responding ensures accurate information is included in the formal schedules submitted with the DCO application

Step-by-Step Guidance for affected residents

  1. Check Your Letter Type: Determine whether you received an informational Subsoil Interest Notification or a Confirmation of Land Interests requiring validation.
  2. Review Your Land Details: For Confirmation Schedules, check that boundary plans, property ownership, and occupier details match your records.
  3. Submit Corrections: If any information is missing or incorrect, send updated details back to Thames Water promptly.
  4. Direct Property Queries & Concerns: Landowners and occupiers are strongly encouraged to raise any property-specific concerns, boundary queries, or general worries directly with Thames Water's team by emailing both property.TDRA@thameswater.co.uk and info.TDRA@thameswater.co.uk. Be sure to keep a detailed record and copy of all your correspondence for future reference.
  5. Stay Informed via SOLAR: Follow local project milestones, environmental impacts, construction timelines, and DCO application updates through the Save Our Lands & River (SOLAR) community campaign.
  6. Prepare for the Examination Phase: Landowners and occupiers with land interests are strongly encouraged to register and participate in the formal Planning Inspectorate DCO examination process when it officially opens.

Key Contacts & Helpful Links

Thames Water Land Team Email: property.TDRA@thameswater.co.uk
Thames Water General TDRA Enquiries: info.TDRA@thameswater.co.uk
Official Thames Water TDRA Project Hub: Thames Water TDRA Project
SOLAR Community Campaign: Access local objection guides, news, and updates at Save Our Lands & River